There is a railway under bridge in the Adhartal area of ​​Jabalpur, which is completely submerged in the night. Passengers passing by this are afraid and they come out of the flyover under compulsion. Local people have informed the railway administration and the municipal corporation about this problem.
By Prashant Pandey
Publish date: Fri, 14 Mar 2025 01:38:15 pm (IST)
Updated date: Fri, 14 Mar 2025 01:50:33 pm (IST)
Highlights
- There is no system of lights in the railway under bridge.
- Passengers remain afraid of accident here.
- Complaint with Railway Administration and Municipal Corporation.
New Duniya Representative, Jabalpur. Passengers passing through the Shobhapur Rail Under Bridge of Adhartal are afraid to pass through the night. Passengers are upset due to darkness in the railway under bridge built on the railway track. This under -bridge coming to the engineering department of Jabalpur Railway Division does not have light system, due to which unethical incidents are happening here during the night.
Not only this, during the night, passengers living near here or children are also afraid to pass through here. Most of the children go to coaching during the evening and night, but due to darkness on the railway under bridge, there will be trouble in passing through here. They leave the fly over under compulsion.
There is no arrangement of light
Apart from this, the area around the under bridge also does not have lighting, security and other facilities. Regional people have informed both the railway administration and the municipal corporation about this, but the problem was not resolved.
Congress leader Pravendra Sen Jumman says that the problem is not only about the railway under -bridge but also has a problem of drinking water system, dilapidated road, street light, water tank leakage in the surrounding areas. Nirmalchand Jain ward New Kanchanpur Aadharatal Jabalpur has informed about this many times, but this hearing is not being held anywhere.
Here … public upset due to wrong billing increasing revenue
Revenue recovery campaign was going on in the month of March under the East Region Electricity Distribution Company. For this, the field officers have also been given target. Average bills are being issued to many people without reading to fulfill this. Complaints are also being made by the people in the power company.
According to the information, revenue collection campaign is being conducted by the power company at all places till 31 March. Till this action is being taken in the city and rural circles of Jabalpur. In the revenue collection campaign, the power company has also given target to the officials.
Averaged billing
To fulfill this, many defaulters have been averaged by the authorities. Due to which consumers are getting upset to improve the bill. Rajendra Aggarwal, a resident of Adarsh ​​Nagar, said that a electricity bill of Rs 14275 has been released, considering the assessed consumption of the meter in his house.
They allege that it is illegal to determine consumption on an attractive basis without any basis. He says that such recovery is also being done from other consumers.
(Tagstotranslate) Jabalpur Railway Under Bridge (T) Darkness (T) Commuters Fear (T) Railway Administration (T) Municipal Corporation (T) Municipal Corporation (T) MADYA PRADESH NEWS (T) Madhya Pradesh Jabalpur News