25 C
Mumbai
Thursday, August 7, 2025

Katra-Srinagar Vande Bharat Train reached Jammu railway station: Now there will be a trial; The Railway Minister shared the video of the train and said- this dream is like coming true

Srinagar6 minutes ago

  • Copy link

On January 11, the Railway Minister shared a video of Katra-Srinagar Vande-India.

Vande Bharat Express designed for Katra-Srinagar route has reached Jammu Tawi railway station. According to media reports, it will be tried now. After this Prime Minister Narendra Modi will flag off. However, the date has not been revealed yet.

Earlier on January 11, Railway Minister Ashwini Vaishnav shared the video of Vande Bharat Express. This train will connect Jammu to the Kashmir Valley. In the 49 second video shared on social media X, the new facilities added to the train were also told. The train has an updated heating system. This prevents water tanks and bio-toilets from freezing. Due to the vacuum system of the train, the air-break will also work easily in minus temperature.

Vaishnav says that the Jammu-Srinagar rail link project is like a dream come true. He had told that the Commissioner of Railway Security (CRS) has done speed trial. This is a very complex project.

4 pictures of Katra-Srinagar Vande Bharat train …

Many new facilities have been included in the train.

Heaters have also been installed in the bathroom of the train.

Vande India’s driver cabin has also been updated.

Silicon heating pads have been installed in the water tank of the train.

97 km tunnel in 111 km route and 4 bridges of 7 km According to railway officials, this is an updated version of the Vande Bharat train. It has been designed according to the season of Jammu and Kashmir, so that it can be run even in bad weather and the passengers do not face any problem.

Final safety inspection has started in the 111 km long Banihal-Katra block built to connect Kashmir in Jammu Division. It is expected to be operational by the end of 2025. Banihal-Katra block has 97 km long tunnel and a total of 7 km long bridges.

Railway Minister said- 12 major changes in Amrit Bharat Train-2.0 Railway Minister Ashwini Vaishnav said on Friday that 12 major changes have been made in the second version of Amrit Bharat trains. Integral Coach Factory (ICF) will build 50 such trains in the next two years. Vaishnav said this during the ICF inspection in Chennai.

Vaishnav said that Prime Minister Modi launched the first version of the Amrit Bharat train last year. Based on the experience of the last one year, many improvements have been made in it. It is also designed to give comfortable travel experience to the poorest people.

He reported that semi-automatic couple, modular toilet, chair pillar and partition, emergency talk feature, emergency brake system, Vande Bharat trains lighting systems, new ergonomic design seats and berths have been improved. The design of the pantry car is also new.

Amrit Bharat Train will have a total of 22 coaches including 8 general coaches, 12 three-tier sleeper coaches and 2 gord compartments. They have been constructed in the Integral Coach Factory (ICF) in Chennai.

Cameras are being installed in front of engines The Railway Minister informed that the Railways has installed armor (system made to stop train accident) in 10,000 engines and 15 thousand kilometers of track side fittings are also being done. Telecom towers are also being installed.

Cameras are being installed in front of engines. New point machines have been designed for security. New designs of bolts of poinch machine have been prepared and now they are being installed in such a way that no one can remove them.

,

Read this news related to rail infrastructure too …

Modi inaugurated the Jammu Rail Division, said- Electrication of 100% railway track is close

Prime Minister Narendra Modi inaugurated the new railway division in Jammu and Charalapalli New Terminal Station in Telangana through a video conference on 6 January. The PM also laid the foundation stone of Raigad Railway Division Building of East Coast Railway.

There are more news …

(Tagstotranslate) Railway Minister (T) Katra-Srinagar Vande-Bharat Video (T) Railway Minister Ashwini Vaishnav (T) Katra-Shrinagar Route Design (T) Vande Vande Vande Train Vande t) Updated Heating System ( t) Jammu-Srinagar Rail Link Project

Source link

Sonu Kumar
Sonu Kumarhttp://newstiger.in
Stay up-to-date with Sonu Ji, who brings you fresh takes on breaking news, technology, and cultural trends. Committed to reliable reporting, Sonu Ji delivers stories that are both informative and engaging.

Related Articles

Leave a Reply

- Advertisement -spot_img

Latest Articles

Enable Notifications OK No thanks